Title ABOUT CONTENTS GLOSSARY
 
J.A.L. Waddell — INDEXBridge Engineering
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

C

Cables,

cradling of, 21

electric, 1795

lift span, 1718, 1719

operating, 1725

rise, economic, 656

steel, weights of, 96

supply, for swing spans, 1706

wire. See Tables for Designing.

Caesar's bridge over the Rhine, 6

Cain, Prof. Wm., 617, 792

Caissons,

battered sides for, 987

blasting foundations for, 983

blowing of, 1001

blowing out materials from, 1000

bracing for, 1049

building up of, 1001

cross-sections of, 986

docks for, 994

dynamiting of, 993

ejecting material from, 999

faces of wells for, 987

false bottoms for, 994

filling of, 995

flaring sides of, 1001

hanging of, 996

holding in position of, 994

inspection of, 1449

jetting pipes for, 990

keeping in correct position, 1001

launching of, 999

logs in, 995

materials of, 983, 984

metal, 986, 987

open-dredging, 1858

origin of, 12

pneumatic, 1857

details of, 1007

founding of, 971

pockets in, 989

pumping out of, 995

reinforced concrete, 986

righting of, 997

side friction on, 996

sinking of, 990, 999

sinking of, through boulders, 992

steel, 990

suspending of, 994, 1000

timber, framing of, 989

timbers for, 998, 1048

tipping of, 996, 997

wooden, designing of, 1004

Calculations. See also Designing.

accuracy of, 1377

approximate method for arches, 868

data for, 1373

files, 1408

filing of, 1386

making and checking of, 1371, 1373, 1378, 1389

plate-girder spans. See Designing of Plate-Girder Spans

sheet, form of, 1374, 1375

time-record for, 1407

Calumet River Vertical Lift Bridge for the Lake Shore & Michigan Southern Ry. Co.,

at South Chicago, Ill.,734, 736, 737

Camber, 751-764, 1644, 1784

approximate method, 756, 757, 758

arch spans, 752

bascule bridges, 753

cantilever bridges, 752, 759, 760

curve, form of, 759

dapping ties for, 359, 751, 752

half-dapping, 752

dimensioning for, 751-764

Petit trusses, 758

pin-connected trusses, 755, 756

plate girders, 329, 332, 753, 754

reason for, 751

reinforced-concrete bridges, 753

riveted trusses, 755

semi-cantilevers, 759

simple truss spans, 754-759

steel arches, 760

suspension bridges, 752, 761

swing spans, 753, 761, 1692

towers of vertical lift spans, 762, 763, 764

trusses, 333

vertical lift bridges, 753, 761

Cambridge Arch Bridge, New Zealand, 630, 638

Camel-back truss, 468, 477, 478

Campbell, C. E. H., 1016

Canfield, August, 22

Canso Bridge design, 1160

Cantilever arch, 632, 633, 636

Cantilever beams, 379, 380, 436

bracing bottom flange, 382

connections, 378, 382

designing of, 922

flanges, design of, 380-382

milling, 382

strap plates, 379, 380

temporary omission of, 1073, 1204

thrust angles, 380

Cantilever bridges, 568-616

American, origin of, 25

anchor arms, attachment of, 614

anchorage details for, 579

artistic effect in, 573

camber for, 752, 759, 760

Canso, Strait of, design of proposed bridge for, 593

Chinese, 7

combination of stresses in, 572

comparative rigidity of, 569

conditions suitable for, 568

connections for suspended span of, 611, 612

curvature of chords for, 589

detailing of, 611

determination of equivalent live loads for, 572

economic comparison with suspension bridges, 1206, 1207

economic lengths,

anchor arm, 1199

anchor span, 1200

suspended span, 581, 1198

economics of, 569, 570, 580, 581, 585, 591, 1198

comparison with simple trusses, 1200

erection stresses in, 573

final connections of, 580

heights of posts for, 589

Hindoo, 7

idle members in, omission of, 577, 579

impact for, 572

increasing widths of, 573

intermediate trusses for, 590

layouts for, 585

legitimate economies in, 589, 590

longest spans of, 25

Mayarí steel for, 71

minimum widths for, 570

Nippon Railway of Japan, 574, 576

North River, proposed, 592

origin of, 6

piers or pedestals for, 590

rollers for main bearings of, 614

Strait of Canso, proposed, 593

stresses in, 572

suitable conditions for, 568

suspenders in, 577

truss depths for, 589

Type A, 587, 1271-1273, 1275

Type B, 588, 589, 1271, 1277-1279

Type C, 588, 1271, 1280-1282

economics of, 592

Type D, 589, 1271, 1283-1285

Wandipore, Tibet, 7

weights of metal in, 581-587, 1271-1285

anchor spans of, 584

anchorages of, 584

piers in, 584

Cantilever draw spans, 665, 666

Cantilevering during erection, 31, 574, 575, 577, 1503, 1504

from rocky bluff, 575, 577

Cantilevering of floors, 483

Cantilever plate-girders, 418, 444, 1672

Cantilever retaining walls, 1037

Cantilevers for train-sheds, 569

Cantilevers for work-shop trusses, 569

Capital stock, amount of, 1598

Capitol Avenue Bridge in Indianapolis, 1169

Car,

overhang of, 148

tilting of, 148

Caravan Bridge over the River Meles, 5

Carbon content in steel, 46

Carbon steel, 45

requirements for, 1770

Carbon-vanadium steel, 84

Care of finished concrete, 952

Carpenter, Mr., 61

Carrying capacities of soils, 964

Carrying of water-pipes, 1076, 1843

Carrying trains, falsework for, 1849

Carroll, Howard, 23

Cartage, 1766

Cartlidge, C. H., , 667

Casing pipe, 1097

Casino for Havana Harbor Bridge, 1077

Cast bases for columns, 340

Cast iron, 337

barring out of, 340

bridges, 16

Cast piles, 1012

Cast shoes, 533

plate-girders, 454

Cast steel, , 337

Castings, 334

annealing of, 338

iron, 1777

steel, 1777

Catalogue file, 1411

Catch-basins, 1835

Catching washed-out material of borings, 1102

Cattle, weight of, 117

Caulking, 988, 1050

Caving of banks, 1059

Cedar, Pacific Coast, 52

Cellular fascines, 1061

Cement,

American, 55

asphalt, 1812

foreign, 55

inspection, 1449, 1452

natural, 17, 28, 55

necessity for testing, 56

Portland, 17, 28

reports, 1487

Roman, 55

Rosendale, 55

specifications for, 1849, 1850, 1851

testing at manufactory, 1470

Centering castings, 1723

Centering for arches, 1502

Centre-bearing swing-spans, 1695

centre wedges for, 1717

distribution of load on, 687

pivot, tracks, rack, and rollers, 1716

reactions for, 691

supporting of, 696

Centre-castings for rim-bearing swing-spans, 1715

Centre line of arch-rib, determination of, 863

Centres, arch, 1769

Centres of gravity,

angles, 424

plate-girder flanges, 427

Centrifugal force, 132, 133, 135

loads, 956, 1654

point of application of, 136

Centrifugal pumps, 979

Cernavoda (Roumania) Bridge, 600

Chalfant, A. G., 596

Changes, 1762

cost of and reasons for, 1081

contracts, 1885

grade on structure, 356

grades, 374, 1748

plans, 1554

temperature, effects of, 1654

reinforced-concrete bridges, 957

tracings, 1385

Channels, 47

built, 495

rolled, 493-495

turned-in flanges of, 339

Channels of streams,

curvature, 1058

obstruction due to piers, 1121

shifting, as affecting layout, 1215

straightness, narrowness, and permanency of, 1090

Charges for inspecting bridges, 1519, 1520

schedules of, 1602, 1603, 1604

Charleston, W. Va., Bridge failure, 1545

Charts of progress, 1486

Check, deposit, 1881

Checkered plates, 374

Checker's duties, 1392

Checking,

calculations, 1371, 1378

drawings, 1382, 1383, 1384, 1395

estimates, 1361

finished design, 280

materials, 1477

shop drawings, 1385, 1396, 1398, 1462, 1411

triangulation work, 1462

Checking-prints, 1395

filing of, 1410

Chester, Mass., Bridge failure, 1543

Chezy formula, 1121

C. B. &. Q. Ry. formula, 1115

Chicago-City-type bascule, 708, 709, 715

Chico cantilever in Mexico, 1068

Chief designer's duties, 1389

Chief draftsman's duties, 1391, 1393

Chinese arches, 9

Choice of type for piers, 969

Chords,

bottom, sections of, , 497

curvature of track, effect of, 145

curved top, 479, 480

deformation of, 208

heating of, 212

packing, 1682

pins, eccentricity of, 340

polygonal, 479, 480

sections, 333, 492, 493, 501, 530, 1675, 1681

splices, location of, 510

top chords, 498-500

trusses, 383, 501, 530, 1675, 1681

Chrome-nickel steel, 58

Chrome-steel, 27, 58

Chrome-vanadium steel for rivets, 84

Chromium in steel, 84

Cincinnati-Newport Bridge, 605, 606

Cinders, 54

Cisco arch cantilevering, 1504, 1505, 1506

City Waterway Bridge, Tacoma, 734, 735, 1075

Clam shell dredges, 992

Clarke, Reeves & Co., 29

Clarke, T. C., 27, 662

Classes of floor systems, 346

Classes of traffic and provision therefor, 341

Classification,

bridges in general, 1632

highway bridges, 1632

reinforced-concrete bridges, 953

Clause index of Chapter LXXVIII, 1735

Clause index of Chapter LXXIX, 1887

Clauses (variable, incomplete, and permanent) in specifications, 1742

Claw couplings, 1729, 1730

Clay,

borings in, 1103

pile-driving in, 1016

puddle for borings, 1098

sinking piers in, 993, 995, 1000

Clay-centered arch-rings, 1537

Cleaning drawings, 1387

Cleaning of metalwork, 767, 768

Clear headway requirements of War Department, 1143

Clearance, 329, 331

between spans, 337

curves, 1638

expansion points, 332, 459

highway bridges, 1639

necessity for, 334, 336

packing, 276

railway bridges, 483, 484, 1638

skew bridges on curves, 147

square bridges on curves, 147

Clips, 366

Cluster piles, 1011

Clutches, friction, 1730

Coalbrookdale Bridge, 16

Coal-tar paving-pitch filler, 1834

Cochrane, V. H., 127, 296, 963

Code of ethics, 1631

Coefficients of elasticity for concrete and stone, 959

Cofferdams, 967, 973, 1051

bracing of, 975

collapsing of, 979

cost of, 979

flooding of, 979

freezing process, 977

leaks in, stopping of, 976

locations for, 973

movable, 978

percolation through, 975

pumping out of, 978

reinforced-concrete, 977

removable, 990

seepage through, 975

selection of type of, 974, 980

types of, 973

waling for, 975

work, 1859

Coignet, Frangois, 18

Colby & Christie, 1412

Colby & Christie's handbook, 1431

Cold-rolled shafting, 337

Collapsing of cofferdams, 979

Collars, 1730

Collection of data, 1082

Collingwood, Francis, 662

Colorado River Bridge at Austin, Texas, 1164

Colossus Bridge, Philadelphia, 20

Columbia River Bridge at Trail, 736, 1026

Column,

anchorage, 278, 304-309, 1643, 1644

batter, 1684

beam action of, 278

cast bases for, 340

compression tests on, 259

contraflexure, point of, 294

details, 1684

disposition, 277

feet, filling of, 1840

footings, calculation of stresses in, 857

designing of, 936

quantities of materials in, 1325, 1328

forked ends of, 285

formulae, origin of, 14

moments of inertia of, 841

overturning moment on bases, 304-309

point of contraflexure, 294

reinforced-concrete,

designing of, 936

quantities of materials in, 1325, 1326, 1327

spacing, economics of, 1194

splicing, 338

towers, batter for, 540

trestles, stresses in, 1659

unit stresses, 322

unsupported lengths of, 960

viaduct, tops of, 339

Combinations of stresses, 250, 1376, 1658, 1659

bending and direct stresses, 251

steel trestles, 250

swing-spans, 1689, 1690

Combined bridges, 341

classes of, 342

economy in designing, 344

Commencement of fieldwork, notice of, 1768

Commercial influences as affecting layout, 1213

Common sense in interpreting specifications, 1556

Compacting of soil, 1008

Comparison of designs, economic, 1182

Comparison of high and low bridges, 663

Comparison of pneumatic and open-dredging processes, 1074

Compensating trusses, 647

Compensation in securities, 1607

Competition, 29

for engineering work, 1620

unprofessional, 1601

Competitive bids, 40

designs, effects of, 283

plans, 1626

Competitors, pooling of, 1533, 1534

Completion of contract, delays in, 1884

estimates of time for, 1363

time of, 1875

Compound interest, 1363, 1364

Compound webs, 500

Compression chords, splices in, 292

Compression flanges of plate-girders, proportioning of, 431

Compression members,

distribution of metal in, 274, 492

intensities of working stresses for, 259, 310

l/r for, 494

proportioning of, 492-505

thickness of web-plates, 1677

unit stresses, 322, 323

Compression and shear in reinforced-concrete beams and slabs, 1657

Compression stresses, 178

Compression tests for concrete, 946

Compression tests on columns, 259

Compressive strength of concrete, 957

Compromise Standard System of Live Loads for Railroad Bridges, 99

Computation of stresses, concentrated-wheel-load method for, 160, 161

Concentrated loads,

plate-girder spans, shears, moments, and reaction, 414, 416, 417, 418

reinforced-concrete slabs, distribution over, 852

Concentrated-wheel-load method of stress computation, 160, 161

Concrete,

abrasion of, 1024

application to American bridgework, 28

base for paving, 368

caissons, advantages of, 1004, 1005

camber for bridges, 753

cinders for, 54

compression tests for, 946

compressive strength of, 957

construction, inspection of, 951

construction work, 946-953

continuity of operation in placing, 1855

cost of cubic yard, 1354-1360

dry surfaces in, 1854

encasing of metal, 769

estimating, 1354-1360

hand-mixing of, 1854

heating materials for, 1044

inspection, 1449

intensities of working stresses for, 958, 959

minimum thickness of, 962

mixing and placing of, 951, 1043, 1853

pavement, 370

paving base, 368, 369

piers,

advantages of, 1022, 1023

coping of, 1024

piles, 1012, 1191, 1856

proportions, 1852

reinforced. See Reinforced concrete.

application to American bridgework, 28

origin of, 17

removal of forms from, 952

revetment, 1062

salt in, 1044

salt water for, 1044

sand for, 54, 55

shafts, designing of, 1024

sidewalks, 1836

specifications for, 1851-1854

stone, 53

impurities in, 53

stresses, working, 958, 959

testing, 1468

testing of hardness of, 953

weights of, 95

working stresses, 958, 959

Concreting in freezing weather, 951

Concreting of arch ribs, 952

Condemnation of old bridges, 1519

Conduits and gas pipes for lighting systems, 1842

Congress Street Bridge at Troy, N. Y., 493

Conjugate pressures, 1032

Connecting plates, strength of, 284

Connecting trestle towers by girders, 538, 539

Connection angles,

floor-beams, 378

plate-girders, 444-446

stringers, 376

wide-legged, 209

Connection at cantilever arm for transmission of wind loads, 611, 613

Connections, reaming of, 1783

Connel Ferry Bridge (Scotland), 603

Conoid of pressure, 1011

Consent of surety, 1885

Considerations in contracts, 1563, 1564

Considère, 18

Construction,

administration of, 1582

engineering of, 1466

facilities as affecting layout, 1216

joints in reinforced-concrete bridges, 950

modus operandi of, 1757

records, filing of, 1410

reinforced-concrete bridges, 946-953

tramways, 999

Consulting bridge engineers, 39

Contingencies, 1349

allowance for, 1599, 1600

Continuity of operation in placing concrete, 1855

Continuity of stringers, 210

Continuous girders and trusses, 482

moment coefficients for, 845

plate-girders, , 419, 444

spans, 1643

stresses in, 850

truss bridges, 25

Contract, 1557

abrogation of, 1565

agents, 1562

alterations or changes in, 1885

arbitration in, 1566

assigning or subletting of, 1566, 1882

author's form of, 1568, 1569, 1570

award of, 1881

bond in, 1566, 1567

changes in, 1565, 1566

clause for extra payments in, 1565

considerations in, 1563, 1564

corrections in, 1570, 1571

dating of, 1562, 1567, 1886

delays in completion of, 1884

description of parties to, 1560, 1561

duration of, 1563

effect of war upon, 1562

erasures in, 1570

essential elements of, 1558, 1559

executed, 1565

extra payment, clause for, 1565

forecasting eventualities for, 1564

form of, 1568, 1569, 1570, 1883

importance of drafting proper, 1557, 1558

letting "get cold," 1571

liquidated damages in, 1564

manifolding of, 1571

opening clauses for, 1559, 1560

parties to, description of, 1560, 1561

"passing the dollar" in, 1564

payment clause of, 1565

penalties, 1564

preambles for, 1560, 1562

promises in, 1563

scope of, 1869, 1870

signatures to, 1567

submission to lawyer for final approval, 1571

Sunday illegal, 1571

U. S. Government, 1562

witnesses to, 1567, 1568

Contraction and expansion, 275

Contractor, 1707

directions to, 1765

duties defined, 1553

incompetent, 1615, 1616

plant, 1616, 1768

rights, 1615

risk, 1766

warning, 1615

work, other, 1765

Contraflexure, point of, in columns, 294

Controllers, 1703, 1794

Conversion of a simple span-bridge into a cantilever structure, 1079

Cooper, Theodore, 29, 98, 269, 634, 662

Coping, 1021, 1052

concrete piers, 1024

quantities for, 1300

Coping of stringers, 375

Copper, 50

nickel steel, 68

Corbeled arches, origin of, 7

Cord, Mr., 17

Core drilling, 1094

equipment for, 1098

Corner brackets, 340

Cornwall, Ontario, Bridge failure, 1544

Corrections,

contracts, 1570, 1571

errors of connections, 1849

secondary stresses, 1784

triangulation angles, 1461

Correspondence, 1388

field, 1479

files, 1411

Corrosion, provision for, 256

steel in salt water, 986

Corrugated bars, 48

Corrugated plates, 47

Corthell, Dr. E. L., 965

Cost, equivalent total first, 1182

Cost plus a lump sum, 1582, 1584

Cost plus a percentage, 1582

Costs. See also Diagrams and Tables for designing.

abutments, plain concrete railway, 1199

alloy steel, 65, 66, 76, 77, 81, 83, 85, 87

borings, paying for, 1604

cofferdams, 979

draw protection, 779

driving piles, 1019

embankments, railway, 1195, 1196

making borings, 1099

materials in place, 1354, 1355, 1359, 1360

nickel steel bridges, 61, 64

power, equipment, movable bridges, 681

sinking piers, 982

swing spans, 698

trestles, 777

vanadium steel bridges, 85

wooden trestles, 1197, 1198

Coulomb, 14

Coulomb formula, 1033

Counterbalancing chains for vertical lift bridges, 772

Counterbracing, 1641, 1642

Counterforted retaining walls, 1037

loads on base slabs of, 1039

loads on counterforts of, 1041

Counterforts, reinforcing of, 1040

spacing of, 1042

Counters for truss spans, 1683

Countersinking ties for hook bolts, 366

Counter system, excess loads for, 1658

Counterweight and operating ropes and their attachments, 1718, 1789, 1790, 1791

Counterweights, 1732, 1792

Couplings, 1101, 1729, 1730

Court settlement, 1617

Cover-plates for plate-girder flanges,

areas, 426, 429

centres of gravity of flanges, 427

flange sections, 422-428

full-length plates, need for, 428

lengths, determination of, 440-444

extra at ends, 440, 443, 444

rivet heads in, undesirability of, 428

rivet pitches, 437

weights, 426

Cover-plates for truss members, 274, 428

compression members thicknesses of, 1677

widths of, 498

Covers for machinery, 1731

Cowing bascule, 712

Cradling of cables, 21

Crane in machinery house, 1734, 1802

Creosoted timber, 775

block paving, 1806

piles, 775, 1013

weights of 95

Cribs, 975, 977

bracing for, 1049

reinforced-concrete, 974

timbers, 1048

Crimping, 332

stiffening angles, 328, 421, 1203

Criterion,

economics of bridge layouts, 1189

maximum bending moment, 164

maximum shear, 162, 164

Critical section for pure shear and diagonal tension in beams, positions of, 836

Critical speeds, 124, 126

Critical velocity, 1127

Criticizing another engineer's work, 1621

Cross-dykes, 1061

Cross-frames near expansion pockets, 398

viaducts, 338

Cross-girders,

plate-girder spans, 1669, 1672

truss spans, 1677

Crossings, right-angled, 1090

Crown hinge for arch bridge, 646

Crowning of roadways, 372, 373

Culverts, 1043, 1864

Curbs, 373, 374

Curbs on embankments, 1837

Current measurements, 1148

Current meters, 1148

Curvature of channel, 1058

Curvature of top chords, 480, 1176

Curvature of track

adjustment of track for, 138

clearance diagrams for, 147

effects of, 132

chords, 145

deck spans, 144

floor-beams, 141

equalizing stresses for, 146

reversion of, 133

Curved approaches, 1091

Curved flanges of plate-girders, 437

Curved members, 272

top chords, 479, 480, 487, 488

trusses, 1071

Curves, clearances on, 1638

Curves on approaches, 1212

Curves, reverse, 1212

Cushions for wood-block pavements, 368, 369

Customs duties, 1755

Cut spikes, 362

Cuts, beveled, 328

Cutting edges, 987, 999, 1050

Cutting of pipe, 1100

Cutting rates, 1605

Cylinder piers, 1025, 1026, 1054, 1056

bracing of, 1026, 1055

strengthening of, 1530

telescoping of, 1026

Cypress, 52