Title ABOUT CONTENTS GLOSSARY
 
C.E. Fowler — INDEXCoffer-dam Process for Piers
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

A

Aa river, Russia, 83

Ancient methods of-

Founding, 1, 3, 4, 5

Pile driving, 5, 40, 41

Pumping, 92, 93

Sheet piling, 6, 7

Anchoring, coffer-dam, 30, 32, 33, 87

Approval, War Dep't, 120

Arkansas river, 20, 70

Architectural design, piers, 125, 127, 131

Arch bridge-

Center, 141

Hutcheson, Scotland, 6

Largest, 3

Melan, Topeka, 78, 119, 141, 142

Roman, 1

Shuster, Persia, 1

Topeka, Kansas, 78, 119, 141, 142

Trezzo, 1

Asphalt for leaks, 65

B

Bamboo casings, 4

Bank protection-

Japanese, 4

Mississippi, 4

Bascule pump, 92

Batter of piers, 125

Bear river, Canada, 83

Bearing-

Piles, 106, 146

Power of piles, 49

Blasting, 33, 73, 89

Boiler riveting, 80, 82, 147

Bolts, 7, 57, 139

See also Drift-bolts

Borings-

Auger, Pierce, 121

Casing for, 121

Clamp for driving tube, 122

Core removal, 122

Cutting shoe for pipe, 122

Drills for, 121

Driving pipe for, 122

Extensive, 121

Hand drills for, 121

Jars for, 121

Maul for driving pipe, 122

Obstructions to, 121

Pebble-tongs, 124

Pump, sand, 121, 122

Removal of core, 122

Rope knives, 121

Rope spears, 121

Sand pump, 121, 122

Screw, adjusting, 121

Spears, rope, 121

Temper screw, 121

Test, 121

Tongs, pebble, 124

Tripod for, 121

Well-driller, 121

Bottom-

Clay, 38, 57, 60, 73, 77

Drift in sand, 18

Gravel, 6, 16, 20, 57, 60, 64, 66, 74, 106, 133

Hard clay, 10, 12, 77, 106

Mud, 17, 38, 60, 62, 77, 106

Open (porous), 16, 28

Overlaid. See Rock

Porous, 16, 28, 141

Quicksand, 67

Rock, 1, 20, 24, 25, 26, 28, 29, 30, 32, 33, 36, 38, 39, 57, 62, 66, 72, 74, 77, 86, 106

Rock, overlaid, 16, 20, 24, 25, 29, 33, 36, 38, 57, 66, 72, 74, 77, 106

Sand, 62, 64, 68, 77, 78, 106

Sand and drift, 18

Sand and shells, 77

Shale, 60

Shells in sand, 77

Silt, 33

Soapstone, 20

Soundings, 86, 120, 121

Uneven, 17, 32, 33, 36, 62, 76, 106

Boxing in leaks, 32, 39, 60

Box pump, 93

Bras d'Or river, Canada, 82

Brace rods, 30, 38, 67, 134

Braces, 7, 30, 33, 38, 39, 56, 64, 67, 76, 80, 83, 84, 135

Bridge location, 120

Bridge cost, economic, 124, 125

Bridges referred to-

Ann Arbor, 59

Arnprior, 18

Arthur Kill, 38, 60

Baltimore, N. Ave., 118

Blackfriars, London, 4

Boucicault France, 109

Buda-Pesth, 8, 28, 50, 53

Caesar's, over Rhine, 5, 40

Charlestown, Boston, 53, 63

Chattanooga, Walnut St., 66, 99, 107

Coteau, 39

Cumberland, Md., 67

Fair Haven, 48

Forth, Scotland, 86, 99, 107

Fort Madison, Ia., 20

Gadsden, Ala., 74

Harvard, Boston, 110

Harlem ship-canal, 36

Harper's Ferry, 63

Hawkesbury, Australia, 80

Hutcheson, Glasgow, 6, 50, 57

Little Rock, Ark., 70, 111

Melbourne, Australia, 33

Momence, Illinois, 62

Neuilly, France, 92

Omaha, Nebraska, 127

Orleans, France, 40, 92, 93

Philadelphia, Walnut St., 24

Phila. & Reading R. R., 74

Putney, England, 77

Red River, 111

Riga-Orel, Russia, 83

Rochester, Court st., 117

Saumur, France, 41

Shuster, Persia, 1

Topeka, Kansas, 78, 119

Trajan's, 40

Tulsa, 20

Victoria, Canada, 83

Westminster, London, 4

Bucket-wheel pump, 92

Bucket for concrete, 36, 39, 110

Bull-wheel pile driver, 41

Bulkhead, 30

C

Cableway-

Capacity of, 117

Carriage for, 117

Span of, 117, 118

Use of, 117

Caisson-

Open, 3, 4, 13

Pneumatic, 5

Water-tight, 74

Calking-

Cylinders, 82

Joints, 20, 36, 147

Canal-

Chicago drainage, 117

Harlem ship, 36

Illinois & Miss., 113

Keokuk, Ia., 30

N. Y. State, 45, 50

Candle wick for leaks, 20

Cane stalks for leaks, 28

Canvas sheet, 30, 31, 32, 33, 35

Capacity of-

Cableway, 117

Dredge, 101, 102, 103, 135, 148

Pumps, 77, 78, 93, 94, 99, 101, 135, 148

Carriage for, cableway, 117

Casing-

Bamboo, 4

Boring, 121

Timber, 5

Cement (see also Concrete)-

Defective, 114, 136

Laitance of, 109

Mortar, 136, 143, 145

Natural, 111, 136, 143, 145

Portland, 113, 115, 116, 142

Quality of, 114, 136, 142, 145

Specifications, 136, 142, 145

Tests of, 115, 136, 142, 145

Center for arch, 141

Centrifugal pump, see Pump

Chamber, width of, 56

Chamber, see puddle

Changes, 139

Channel-

Establishing new, 3

Fixed place for, 120

Requirements of Gov't, 120

Chapelet pump, 92, 93

Charles river, Boston, 63, 110

Circular-

Coffer-dam, see Coffer-dam

Pier of granite, 86

Shell for pier, see cylinder

Clam-shell dredge, 102

Clamp for-

Coffer-dam, 38

Pile-driver, 43

Pipe, 122

Sheet piles, 57

Classification of excavation, 135, 145

Clay, see Bottom

Clay puddle, see Puddle

Clearance in coffer-dam, 74, 147

Clyde river, Scotland, 6

Coffer-dam-

Anchoring, 30, 32, 33, 37

Calculation of, 54, 56, 84

Canvas and plank, 30, 32, 33, 35

Circular, 20, 24, 87, 147

Clearance in, 74, 147

Cost of, 61, 76, 77

Crib type, 14, 15, 17, 18, 20, 26, 32, 33, 36, 38, 39, 72

Damaged, 24, 32, 35, 60, 66, 76

Decking for, 134

Definition of, 13

Deposit in, 134

Earth bank type, 5, 13, 14, 26

Economy in, 26

Erecting steel, 147

Failure of, 16, 24, 28, 30, 32, 60

Floating type, 74

Frame for, 30, 35, 59, 66, 67, 75

Grillage type, 20, 24

Half-tide, 89

Largest recorded, 8

Location of, 86, 87

Metal, type of, 83, 86, 147

Movable, 20, 33, 74, 75, 76

Moving, time required, 76

Origin of, 3, 5

Pivot pier, 20, 36, 38, 39, 147

Polygonal type, 36, 38, 39

Price for, 139

Protection, 26, 33

Puddle, pressure on, 54

Puddle for, see Puddle

Removal of, 120, 33, 74, 134, 147

Removing piers by, 72, 74

Robinson, circular, 24

Sheet pile type, 6, 8, 9, 24, 26, 59, 60, 61, 62, 63, 64, 65, 134

Sinking with stone, 20, 76

Specifications for, 6, 134, 141, 146, 147

Splicing in height, 67, 147

Tarpaulin and plank, 30, 32, 33, 35

Tidewater type, 8, 53, 63, 86

Wakefield piling, 14, 20, 53, 61, 62, 63, 64, 141

Water pressure on, 54, 56

Width of chambers, 56

Compartments, water-tight, 76

Completion of work, 139

Composition of concrete, see Concrete

Compound sheet piles, 52, 53 , 61, 66

Concrete-

Ancient use of, 2, 4

Bucket for depositing, 36, 39, 110

Composition of, 107, 110, 111, 116, 138, 143, 145

Cost of, 117

Depositing, rate of, 115

Facing for, 72, 111, 114, 143

Forms for, 111, 113, 115, 141, 142, 144

Foundation of, 18, 24, 36, 60, 61, 63, 67, 72, 107, 108, 116, 117, 138, 143, 144, 146

Laitance, 109

Laying, rules for, 113, 138, 143, 145

Layers, proper thickness, 109, 113, 138, 143, 144, 145

Leveling course, 107, 117

Louisville cement used, 111

Monolithic construction, 72, 111, 112, 113, 143

Oil paper on forms, 142

Piers of, 72, 111, 143, 144

Pier filling, 80, 82, 143

Portland cement used, 72, 113, 115, 116, 143

Proportions of, 67, 72, 107, 110, 111, 116, 138, 143, 145

Puddle of, 38, 78, 87

Rate of deposit, 115, 143, 144, 145

Rules for laying, 113, 138, 143, 144, 145

Sacked for placing, 107

Sand for, 111, 115, 136, 143, 145

Setting time, 110, 114, 143, 144, 145

Stone for, 111, 115, 143, 145

Tube for depositing, 108, 110

Under water, 36, 39, 107, 108, 109, 110, 142

Water, amount for, 113, 114, 143

Wells in, 114

Coosa river, Ala., 74, 110, 117

Coping, 125, 127, 129, 137

Corbel course, 127, 129

Core removal, test, 122

Corporation, applicant for bridge, 120

Cost of-

Bridge, least, 124

Coffer-dam, 61, 76, 77

Concrete, 117

Dredgers, 103

Dredging, 103, 148

Driving piles, 48

Formula for,

spans, 124

bridge, 124

piers, 125

Hoist-engines, 44, 45

Piers, 125

Pumps, 93, 148

Removing pier, 74

Spans, 124

Crevices in rock, see Rock

Cribs, 26, 33, 111

Crib anchor, 33, 134, 135

Crib coffer-dam, see Coffer-dam

Current, strength of, 120

Cutting edges, 80, 122, 147

Cutting shoe, 122

Cutwaters, 10, 18, 26, 66, 129, 130, 131

Cylinder-

Bracing for, 83, 84

Calking for, 82

Guide for, 81

Pier, 33, 80, 82, 83, 87

Piles for, 83

Thickness of, 82, 83, 84

D

Damaged-

Coffer-dam, 24, 32, 35, 60, 66, 76

Piles, 10

Danube river, 9, 40

Decking for coffer-dam, 134

Defects in-

Cement, 114, 136

Piles, 10

Stone, 137

Deposit in coffer-dam, 134

Depositing concrete under water, see Concrete

Derricks, 102, 117

Derrick, see Pile-driver

Design of piers, see Piers

Direct connected pump, 97

Disposal of excavation, 26, 60, 71

Diver employed, 31, 36, 76, 87

Docks, Victoria, B. C., 77

Dowels for stone, 137

Drawings to show-

Bridge location, 120

Bridge plan, 120

Dredger-

Capacity of, 101, 102, 103, 135, 148

Clam-shell, 102

Claw, 72, 80, 102

Cost of, 103, 148

Derrick for, 102

Dipper, 103

Edward's Cataract pump, 101

Elevator type, 102

Engine for, 78, 148

Furnished, 134

Grapple, 102

Lancaster, 102

Osgood, 103

Pump, 78, 99, 101, 148

Sand-digger, 102

Scraper, 13

Seagoing, 101

Spoon, 13

Dredging, 10, 15, 80

Amount necessary, 16

Cost of, 102, 103, 105

Pumps for, 78, 99, 101, 148

Rock, 72

Soft bottom, 106

Wells for, 80

Drift in sand, 18

Drift bolts, 33, 36, 38, 39, 57, 60, 71

Drilling, test, see Boring

Driver, see Pile-driver

Durability of piles, 40, 72

E

Earth bank coffer-dam, see Coffer-dam

Economic-

Bridge cost, 124, 125

Coffer-dam construction, 26

Pier spacing, 120, 124, 125

Eddies, 129, 130, 131

Efficiency of pumps, 96, 148, 149

Ejector for priming, 101, 148

Electricity—

Blasting by, 73

Hoisting by, 98, 117

Pumping by, 97

Engine, see Hoist

Erection, steel coffer-dam, 147

Estimates, 139, 146

European pier design, 127

Examination for bridge site, 120

Excavation (see Dredging) - 7, 10, 60, 61

Classification, 135, 145

Disposal of, 26, 60, 71, 135

Measurement, 139

Rock, 72, 86, 145

Scraper for, 13

Spoon for, 14

Experiments-

Piers, form of, 129, 130, 131

Puddle, 12

Timber, wet, 33

Exterior puddle, see Puddle

F

Facing for concrete, 72, 111, 114, 143

Failure of-

Coffer-dam, see Coffer-dam

Contractor to prosecute work, 139

Puddle, 28

Filling, see Puddle

Floating coffer-dam, 74

Footing course, 4, 117, 127

Form of-

Foundation, 5, 124

Piers, 129, 130, 131

Sheet piles, 50, 51, 52, 53

Forms for concrete, 111, 113, 115, 141, 142, 144

Formula for-

Cost of hoists, 45

Cylinder thickness, 84

Economic span, 124

Pile loads, 49

Sheet pile thickness, 54, 56

Struts, 56

Fort Monroe, Va., 64

Forth Bridge piers, 86

Foundations-

Ancient, 1, 3, 4, 5, 40

Care, increased, 1

Changes in, 136

Character of, 106, 117, 124, 146

Coffer-dam, origin, 3, 5

Concrete, see Concrete

Crib, early type, 5

Difficult, very, 120, 124

Doubt of obtaining, 125, 146

Encaissement, 3

Footing course, 4, 117, 127

Form of, 5, 124, 146

Grillage, 20, 24, 60, 67, 71, 72, 106

Open caissons, 3, 4, 13

Origin, sub-aqueous, 3

Piles and concrete, 3, 106, 110

Piles, bearing, 106, 146

Piles under cylinders, 83

Pneumatic caisson, 5

Risk of, 125

Rock bottom, see Bottom

Roman, 1

Steel shells, 33, 80, 82, 83, 87

Sub aqueous, 3, 77

Tropical, 1

Frame for coffer-dam see Coffer-dam

Freshet, damage by, 66, 76

Friction lever, 44

Frost on mortar, 136

G

Gate valve for priming, 101

Girders, circular, 89, 147

Government-

Approval, 120

Requirements, 120

Grades, 135

Gravel bed, see Bottom

Gravel in puddle, 12, 15, 26, 76, see Puddle

Grease for leaks, 30, 36

Grillage (see also Foundation)-

Removal, 74

Guide-

Cylinder pier, 81

Piles, 7, 49, 57, 71

Pile-driver, 43

Pipe for drilling, 121

Guide for piles, 43, 57

Gunny sacks, 26, 28, 33, 36, 64, 76

H

Half-tide coffer-dam, 89

Hammer, see Pile-driver

Hand-

Derrick, 40, 41, 43

Pump, 93

Harlem ship-canal bridge, 36

Hoist-

Cost of, 44, 45

Electric, 98, 117

Weight of, 149, 150

Hoist engine for-

Derrick, 117, 149, 150

Pile-driver, 44, 45, 68, 78, 149, 150

Scraper, 13

Huron river, Mich., 59

Hutcheson bridge, 6

I

Ice protection, 9, 10, 26, 129, 130, 131

Illinois & Miss. canal, 113

Illinois river, 62

Inspection, 139

Iron coffer-dam, 83, 86

Iron sheet piles, 91

J

Jet for pile-driver, 70

K

Kanawah river, W. Va., 14, 117

Kankakee river, 62

Karun river, Persia, 1

Key piles, 57

Knives for drill-rope, 121

L

Laitance of cement, 109

Lansdell siphon, 93

Largest-

Arch, 3

Coffer-dam, 8

Layers of concrete, 109, 113, 138, 143, 144, 145

Laying concrete, rules for, 113, 138, 143, 145

Leaks cured by-

Asphalt, 65

Boxing in, 32, 39, 60

Calking joints, 20, 36

Candle wicking, 20, 39

Cane-stalks crushed, 28

Canvas funnel, 32

Clay cylinders, 29

Clay dams, 89

Concrete in sacks, 66

Exterior puddle, 28, 78

Gravel and clay, 26

Grease, 30, 36

Grouting, 89

Hot asphalt, 65

Manure, 28, 32

Packing puddle, 12, 28, 77

Puddle, exterior, 28, 78

Puddling rock seams, 25

Repuddling, 28

Round braces, 30, 38

Sacks, 26, 36, 66, 76

Sheet piles, 12, 28

Stiff grease, 30, 36

Stock ramming, 12, 23, 77

Straw and gravel, 20, 28

Tarpaulin, 30, 32, 33, 35, 36, 65

Washers on rods, 30

Water-head, 32, 39

Ledges, see Rock

Length, economic span, 124, 125

Leveling course concrete, 107, 117

Lift of pumps, 96, 100, 148, 149

Little Bras d'Or river, Canada, 82

Location of-

Bridge, 120

Coffer-dam, 86, 87

Piers, 120

Pumps, 100

M

Manure for leaks, 28, 32

Map of bridge location, 120

Maslin pump, 96

Masonry-

Ashlar, 136

Footing courses, 74, 117

Laying, 137

Marking stones, 74

Measurement, 139

Removing, 73, 74

Rubble, 86, 90

Specifications for, 136, 137, 138

Mass. sewerage system, 60, 61

Mattresses, 4

Maul for driving pipe, 122

Maul as pile-driver, 40

Measurement of work, 139

Melan Arch, Topeka, 78

Metal coffer-dam, 35, 83, 86, 147

Missouri river, 127

Mississippi river, 20, 32, 67

Monolithic concrete, 72, 111, 112, 113, 143

Morison's pier design, 125

Mortar, cement, 136, 143, 145

Movable coffer-dam, see Coffer-dam

Mud, see Bottom

N

Nasmyth hammer, 14, 45, 46, 47, 48, 49

Natural cement, 111, 136, 143, 145

Navigable rivers, see River

Navigation, needs of, 120

Interference with, 135

New York State canals, 45, 50

Nippers, pile-driver, 43

O

Obstruction-

To boring, 121

By piers, 125

Ohio river, 15, 133

Oil paper for concreting, 142

Origin of-

Coffer-dam, 3, 5

Foundations, 3

P

Packing puddle, 12, 28, 77

Painting, 65, 147

Parnitz river, Germany, 72

Payment, manner of, 134

Pierce boring auger, 121

Piers-

Architectural design, 125, 127, 131

Batter of, 125

Bracing for cylinders, 83

Concrete, 72, 111, 143, 144

Coping for, 125, 127, 129

Cost of, for economy, 125

Cylinder, 33, 80, 82, 83

Design of, 125, 127, 129, 130, 131

Economic spacing, 120

European design, 127

Experiments on form, 129, 130, 131

Filling of concrete, 80, 82, 143

Forth bridge, 86

Hutcheson, 6

Location of, 120, 125

Morison's design, 125

Obstruction of, 125, 129, 130, 131

Pivot, 82

Relation to spans, 1, 124

Removal, 72, 74

Starlings of, 125, 129, 130, 131

Thickness of tubular, 84

Tubular steel, 33, 80, 82, 83

Pile-driver-

Ancient, 5, 40, 41

Beetle for, 40

Bull-wheel for, 41

Clamps, 43

Cost of outfit, 43, 44

Cram-Nasmyth, 49

Derrick, 41, 42, 43, 45

Engine, 44, 45, 78, 149, 150

Friction lever, 44

Guides, 43

Hammer, 41, 43, 44, 68, 77, 78

Hand derrick, 40, 41, 43

Hoist engine for, 44, 45, 68, 78, 149, 150

Horse-power, 41, 43

Lidgerwood, 43

Maul, 40

Nasmyth, 14, 45, 46, 47, 48, 49

Nippers, 43

Rock drill used, 14

Scow for, 43, 44, 45

Sheet pile, 14, 41

Sledge, 40

Tongs, 43

Warrington-Nasmyth, 46, 47

Water jet, 70

Windlass, 40

Piles-

Ancient use, 3, 4, 5, 40

Bearing, 106, 146

Bearing power, 49, 146

Blasting out, 73

Cost driving, 48

Clamps, 43

Damaged, 10

Durability of, 40, 72

Guide 7, 57, 49, 71

Guiding, 43

Key, 57

Payment for, 139, 146

Pointing, see Pointing

Protection, 134

Pulling, 50, 73

Pulling lever, 50

Pulling scow, 50

Rings for, 70

Sawing off, 50, 83, 146

Sheet piles, ancient, 4

See also sheet piles

Shoes, 50, 53

Specifications for, 135, 141, 146

Splitting of, 43

Temporary, 135

Under cylinders, 83

Pivot pier-

Cylinders for, 82

Coffer-dam for, 20, 36, 38, 39, 147

Pointing piles, 24, 50, 51, 53, 57, 60

Pointing with mortar, 136

Porous bottom, 16, 28, 141

Portland cement, 72, 113, 115, 116, 142

Potomac river, 63

Primers for pumps, 100, 101, 148

Pressure of-

Puddle, 54

Water, see Water

Proportions for concrete, 67, 72, 107, 110, 111, 116, 138, 143, 145

Protection of-

Bank, 4

Coffer dam, 26, 33, 134

From ice, see Ice

Puddle-

Blue clay, 72

Chamber, 7, 10, 33, 36, 38, 56, 66, 72, 74, 77

Clay, 7, 17, 26, 33, 66, 88

Clay and gravel, 12, 15, 26, 76, 134

Concrete, 39, 78, 87

Experiments, 12

Exterior, 17, 20, 25, 26, 28, 33, 63, 66, 71, 76, 77

Failure of, 28

Pressure of, 54

Sacked, 26, 28, 33, 64

Pulling piles, 50, 73

Pulling test tubing, 124

Pulsometer, 30, 32, 90, 94, 95

Pumping, 15, 17, 18, 25, 30, 32, 39, 61, 63, 64, 66, 72, 76, 89

Amount of, 92

Electricity for, 97

Pumps-

Ancient, 92, 93

Bascule, 92

Box, 93

Bucket-wheel, 92

Capacity, 77, 78, 93, 94, 99, 101, 135, 148

Centrifugal, 15, 17, 18, 30, 39, 61, 63, 66, 77, 78, 90, 96, 97, 98, 99, 100, 148, 149

Chapelet, 92, 93

Chattanooga plant, 99

Cost of, 93, 148

Direct connected, 97

Double suction, 100

Dredging, 78, 99, 101, 148

Edward's cataract, 101

Efficiency of, 96

Ejector for priming, 101, 148

Electric, 97

Forth bridge, 99

Furnished, 134

Gate valve primer, 101

German high test, 97

Hand, 93

Heald & Sisco, 97, 148

Lift of, 96, 100, 148

Location, best, 100

Maslin, 96

Piston of dredging, 101

Primers, 100, 148

Pulsometer, 30, 32, 90, 94, 95

Reciprocating, 96

Sampling, 121, 122

Siphon, 93

Speed for, 149

Strainers for, 98

Suction details, 98

Suction pipe, 98, 100, 148

Sump or well for, 60, 99

Tests of, 96, 97

Weight of, 148

Wooden, 93

Q

Quality of-

Cement, 114, 136, 142, 145

Timber, 135, 139, 146

Quicksand, 67, 135

R

Rammer for puddle, 28, 77

Red river, U. S., 111

Rejection of material, 137, 139

Removal of-

Coffer-dam, 20, 33, 74, 134, 147

Grillage, 74

Piers, 72, 74

Piles, 50, 73

Test core, 122

Republican river, Kan., 20

Requirements, War Dep't, 120

Rhine river, 5

Rings for piles, 70

Rip-rap, 26, 72, 83

Rivers, navigable, 120

River-

Aa, Russia, 83

Arkansas, 20, 70

Bear, Can., 83

Charles, Boston, 63, 110

Clyde, Scotland, 6

Coosa, Ala., 74, 110, 117

Danube, 9, 40

Huron, Mich., 59

Illinois, 62

Kanawah, W. Va., 14, 117

Kankakee, Ill., 62

Karun, Persia, 1

Little Bras d'Or, 82

Missouri, 127

Mississippi, 20, 32, 67

Ohio, 15

Parnitz, Germany, 72

Potomac, 63

Red, 111

Republican, Kan., 20

Rhine, 5

Sault Ste. Marie, 28

Schuylkill, Pa., 74

Scioto, Ohio, 13

Soane, France, 109

St. Lawrence, 18

Tennessee, 66

Thames, 4, 77

Western, U. S., 17, 18, 20

Riveting-

Boiler, 80, 82, 147

Water-tight, 80, 82, 147

Roads, construction, 3

Robinson, coffer-dam, 24

Rock-

Bottom, see Bottom

Crevices, 25, 28, 39, 66, 89, 107

Joint with sheet piles, 72

Ledges, 86

Stepping of, 86, 107

Rock-drill pile-driver, 14

Rod bracing, 30, 38, 67, 134

Roman foundations, 1

Rubble masonry, 86, 90

Rules laying concrete, 113, 138, 143, 144, 145

S

Sacked puddle, see Puddle

Sacks used, 26, 28, 33, 36, 64, 66, 76

Samples of borings, 121, 122

Sampling pumps, 121, 122

Sand (see also Bottom)-

For concrete, 111, 115, 136, 143, 145

Digger, 102

Drift in, 18

Pump, 121, 122

Shells in, 77

Sault Ste. Marie river, 28

Sawing off piles, 50, 83

Schuylkill river, 74

Scioto river, Ohio, 13

Scow, pile pulling, 50

Scow, see Pile-driver

Scraper, 13

Sec'y of War, approval, 120

Setting time, concrete, 110, 114, 143, 144, 145

Sewer coffer-dam, 60, 61

Shale, 60

Sheet pile coffer-dam, see Coffer-dam

Sheet piles-

Calculations, 54, 56

Clamps for, 57

Close, 135

Compound, 52, 53, 61, 66

Driver for, 14, 41

Early use, 4, 6, 7

Forms of, 50, 51

Guides, 57

Leak remedy, 12, 28

Metal, 91

Old, 72

Plank, 35, 50, 59, 60, 66, 67, 77, 134

Pointing, 24, 50, 51, 57, 60

Rock joint with, 72

Shoes for, 50, 51, 52

Slanting, 60, 61

Square, 8, 10, 24, 51, 60, 77

Thickness, 53, 54, 56

Tongue and groove, 20, 24, 51, 60, 71, 76, 77, 78

V shape, 20, 51

Wakefield, 14, 20, 53, 61, 62, 63, 64, 141

Shells in bottom, 77

Shocks of waves, 83, 89

Shoe for-

Piles, 50, 53

Pipe, 122

Sheet piles, 50, 51, 52

Shoring, see Bracing

Silt bottom, 33

Sinking coffer-dam, 20, 76

Siphon, 93

Site of bridge, 120

Site, examination of, 120, 124

Slanting piles, 60, 61

Sledge for pile-driver, 40

Sluice, 7, 87

Soane river, France, 109

Soapstone bottom, 20

Sounding rod, 86

Soundings, 86, 120, 121

Spans-

Cableway, 117, 118

Economic formula, 125

Economic length, 124, 125

Length of, 124

Relation to piers, 1, 124

Spacing of piers, 120, 124, 125

Spears for drill rope, 121

Specification for-

Coffer-dam, see Coffer-dam

Cement, see Cement

Foundation, 141, 146

Masonry, 136, 137, 138

Piles, 135, 141, 146

Steel coffer-dam, 147

Timber, 138, 139, 146

Speed for pumps, 149

Splicing cofferdams, 67, 147

Springs in bottom, 32

Spuds, 75

Staging to locate pier, 86

Starlings, 10, 18, 26, 66, 125, 129, 130, 131

Steel coffer-dam, 83, 86, 147

Steel shells, 80, 82, 83

St. Lawrence river, 18

Stock rammer, 12, 28, 77

Stone-

Concretes, 111, 115, 143, 145

Defects in, 137

Dressing, 137

Protection, 83, 135

Quality of, 136

Rubble, 137

Samples, 137

Substitute for, 80

Strainer for pump, 98

Struts, see Timber

Suction-pipe, 98, 148

Sump for pump 60, 99

Suspension bridge tower, 8

Swab, 121

Swift water, see Water

T

Tables of-

Pumps, centrifugal, 148

Pumps, dredging, 148

Pump speed, 149

Hoisting engines, 149, 150

Tarpaulin used, 30, 32, 33, 35, 36, 65

Tennessee river, 66

Test borings, see Borings

Tests of-

Cement, 115, 136, 142, 145

Pumps, 96, 97

Thames river, 4, 77

Thickness of-

Cylinders, 84

Sheet piles, 53, 54, 56

Tide coffer-dam, 8, 53, 63, 86, 89

Tide, see Water

Timber-

Casing, 5

Framing, 135

Piles

see Piles

see sheet piles

Price for, 119, 146

Scarcity of, 79

Specifications, 138, 139, 146

Struts, 7, 30, 33, 38, 39, 56, 64

Water-soaked, 33

Tongs-

Pebble, 124

Pile-driver, 43

Tongue and groove, see Sheet piles

Tools furnished, 134

Topeka coffer dam, 78

Trezzo arch, 1

Tripod for test boring, 121

Tube for-

Concreting, 108, 110

Drilling, 121

Pier, 33, 80, 82, 83, 87

V

Van Duzen jet, 93

Velocity of water, 130, 131

Victoria, B. C., docks, 77

Voids in masonry, 136

V shape pile joint, 20, 51

W

Wakefield sheet piles, see Sheet piles

Wales-

Calculation of, 56

Ordinary, 7, 35, 59, 134

War Dep't requirements, 120

Washers for leaks, 30

Water-

For concrete, 113, 114, 143

Deep, 8, 10, 63

Eddies, 129, 130, 131

High, 118, 119, 120

Jet, 70

Low, 120

Pressure, 20, 25, 28, 32, 35, 54, 85, 89

Shallow, 1, 5, 13

Shock of waves, 83, 89

Soaked timber, 33

Swift, 10, 26, 32, 107

Tide, 8, 86

Velocity, 129, 130, 131

Water-tight compartments, 76

Water-tight riveting, 80, 82, 147

Waterway, 120, 129

Weight of-

Hoist engines, 149, 150

Pumps, 148

Well driller, 121

Well for pump, 60, 99

Wells in concrete, 114

Wellington pile formula, 49

Western, U. S., rivers, 17, 18, 20

Windlass pile-driver, 40

Wooden pump, 93